NEW YORK-PRESBYTERIAN QUEENS HOSPITAL

HEALTHCARE

PROJECT BACKGROUND

New York-Presbyterian Queens Hospital is a 535-bed tertiary community teaching hospital that provides services in 14 clinical departments and numerous subspecialties to Queens and metro New York residents.

CHALLENGE

Patients seek medical care at New York-Presbyterian Queens Hospital for various ailments through inpatient and outpatient procedures or ongoing treatments. Any disruption would severely impact the day-to-day activities of the hospital’s various units. New York-Presbyterian Queens Hospital is faced with the ongoing challenge of remodeling various units with minimal disruption to patient care. The facility requested an overnight turnover for critical care areas to provide minimal downtime or loss of space as this would be detrimental to both patient care and revenue.

PROCESSTRADITIONAL DRY BACK LVTSETAGRIP
ICRA1/2 day
Workspace generally requires a barrier or curtain wall and outside vented negative air machine for occupied renovation. Significant dust generation during demo and surface prep and adhesive odors during install
None
As SetaGrip™ was able to be laid directly over the existing floor, there was no demo, dust, or odor created. Thus the installer was able to avoid using a barrier, curtain wall, and expensive negative air equipment
DEMO1 day
Remove existing flooring
None
Only needed when the existing flooring
is not well bonded to substrate
SURFACE PREP1-2 days
Prepare substrate
1-2 hours
Vacuum and light damp mop
INSTALL1 day
800-1000 SF per 8 hour day – 2 man crew
1 day
1200-1500 SF per 8 hour day – 2 man crew
POST-INSTALLWait
Foot Traffic: 24 Hours wait
Rolling Loads/ Heavy Point Loads: 48-72 Hours
No Wait
Foot Traffic: Immediate Use
Rolling Loads/ Heavy Point Loads: Immediate Use

OUTCOME

Each remodeled unit at New York-Presbyterian Queens Hospital was completed within 24 hours from start to finish including replacing the wall base. The Hemodialysis area was slightly more than 2,000 SF and was turned around in just 14 hours. Using SetaGrip™ was a significantly quicker process than traditional LVT installation and ultimately more cost-effective. The hospital did not have to close any of the patient care areas during the renovation and was able to continue medical care with minimal downtime and disruptions to patients. SetaGrip™ does not create dust or odors during installation. Therefore, New York-Presbyterian Queens Hospital saved significant time and money as there was no need for containment barriers or expensive negative air return equipment.